Peak Scientific Instruments Ltd

Whitecross project managed their new generator production facility and associated offices

  • Client: PEAK Scientific Instruments Ltd
  • Development: Inchinnan Business Park
  • Area: 16,000 sq ft
  • Project Value: £250,000
  • Our Role: Project Management

Get in touch for more information

Whitecross acted as Contract Administrators in relation to the refurbishment of an existing industrial building in Inchinnan Business Park.

The premises had recently been acquired by the client and were in a poor condition requiring extensive works to be carried out to suit the client use as a generator production facility.

The works comprised general external works including works to the main curtain walling system along with strip out and refurbishment of all internal parts to include new ceilings, floor coverings, toilet facilities, lighting throughout and specialist repair and decoration of the main concrete floor to the production area.

This project involved a very tight timescale and shows how with stringent control measures and detailed documentation put in place, ensured that the building could be occupied by the date set by the client’s operational requirements. During the project a number of unexpected issues required to be carefully and efficiently resolved. With regular site meetings and liaison with the contractor and client these were resolved professionally and cost effectively.